
Properties
INDUSTRIAL PLOTS IN MEERUT
Meerut industrial plots in a 529-acre IMLC near NH-34. 15,000 sqm, 2-side open, interview-based allotment, 2 km from Kharkhauda station. Get the brochure and details from ERM Global Investors today!
Enquiry Now→Property Overview
Highlights
- Close to railway station and airports
- Ideal for logistics, storage, and factories
- 2 Side Open Plots
- Excellent connectivity via NH-34
- Prime location in Meerut growth zone
Features Of Project

Logistics & Warehousing Zone
Property Details
If your unit in Noida, Ghaziabad or Delhi is running out of room, Meerut has probably come up in the conversation already. It sits at the western start of the Ganga Expressway. A rapid rail link now connects it to Delhi. And UPEIDA, the state authority that builds expressways and the industrial land beside them, has laid out a 529-acre cluster right on the road.
This guide to Meerut industrial plots covers what a buyer needs to know: where the plots are, what they cost, what else you will pay, who can apply and how the process runs. Every figure comes from a named source. Where a number isn't published yet, we say so.
Meerut industrial plots at a glance
Here is the whole project on one screen. The sections below explain each line.
| Detail | What we know |
| Project | Meerut Integrated Manufacturing and Logistics Cluster (IMLC) |
| Developer | UPEIDA (Uttar Pradesh Expressways Industrial Development Authority) |
| Location | Bijauli and Kharkhauda, Sadar Tehsil, Meerut |
| Position | About 9 km from Meerut city, at km 10 on the right side of the Ganga Expressway |
| Planned area | 529 acres |
| Advertised premium | ₹11,470 per sq m |
| Also payable | ₹59,000 processing fee, 2.5% annual lease rental, GST |
| Plot size listed | From 15,000 sq m |
| Permitted use | Manufacturing, warehousing, logistics, MSME units |
What are industrial plots in Meerut?
Industrial plots in Meerut are land parcels inside the Meerut IMLC, a planned cluster that UPEIDA is building beside the Ganga Expressway. UPEIDA stands for Uttar Pradesh Expressways Industrial Development Authority. Its job is to develop expressways and the industrial land around them.
So you are not hunting for farmland near a highway and hoping the approvals work out. You are applying for a plot in a government-planned layout, with roads and utilities built into the design. If you have been searching for industrial land in Meerut, this is the government-planned option.
The word "cluster" matters. UPEIDA plans 27 IMLCs across 26 districts of Uttar Pradesh. Meerut is one of eight open for allotment in the current round, which began on 16 October 2026.
Why the Ganga Expressway matters for industrial land in Meerut
Industrial plots near the Ganga Expressway are only as useful as the road. The expressway is now open, and the numbers are large:
- Opened on 29 April 2026, inaugurated by the Prime Minister at Hardoi.
- 594 km long, running from Meerut to Prayagraj through 12 districts.
- Six lanes, expandable to eight, designed for speeds up to 120 km/h.
- Built at a cost of about ₹36,230 crore.
- Cuts the Meerut to Prayagraj drive from roughly 10 to 12 hours down to about 6 hours.
- Has drawn nearly 1,000 investment proposals worth around ₹47,000 crore along the corridor, according to reports.
UPEIDA has marked out 12 industrial nodes along the route, about 6,500 acres in total. Meerut, at 529 acres, is the node at the western end.
How much do Meerut industrial plots cost?
| Cluster | Premium (₹ per sq m) | Planned area (acres) | Expressway |
| Meerut | 11,470 | 529 | Ganga Expressway |
| Auraiya | 7,920 | 324 | Bundelkhand Expressway |
| Sambhal | 5,000 | 591 | Ganga Expressway |
| Etawah | 4,550 | 217 | Agra–Lucknow Expressway |
| Firozabad | 4,400 | 344 | Agra–Lucknow Expressway |
| Shahjahanpur | 4,400 | 252 | Ganga Expressway |
| Hamirpur | 3,900 | 259 | Bundelkhand Expressway |
| Hardoi | 3,800 | 335 | Ganga Expressway |
What does investor demand in Meerut look like?
A December 2025 report gave a sense of scale. It said investments of nearly ₹8,000 crore were lined up in Meerut across MSME, residential and commercial projects, and that proposals at Bijauli on the Ganga Expressway were around ₹10,000 crore.
Named proposals included Ball Beverage (₹3,000 crore proposed) and Tata Power (a ₹3,000 crore semiconductor plant, subject to approvals).
These are proposals, not running factories. Some will happen, some won't, and timing will vary. Read them as a sign of interest, not a forecast.
Meerut against the other UPEIDA clusters

Where is the Meerut IMLC located?
The cluster is in Sadar Tehsil, Meerut, around the villages of Bijauli and Kharkhauda. UPEIDA's own announcement puts it about 9 km from Meerut city and at km 10 on the right side of the Ganga Expressway.
The expressway itself starts at Bijauli village in Meerut district. That puts the cluster close to the road's western start, so trucks leaving your plot can get onto a six-lane, access-controlled expressway near where it begins.

Property Attachments
Meerut-Industrial-Plots.pdf
Meerut-Industrial-Plots.pdf
Click to unlock pdf document
File size: 691.09 KB
Location Map
Contact Us
Ready to Work Together? Build a project with us!
FAQ
